PROJECTS

NUNNERY WOOD HIGH SCHOOL

This was a £3m project to replace the existing ROSLA block. We assisted the school with securing funding and provided a turn-key package from the bid stage. The accommodation includes the DT, Music and drama departments and hummanities classrooms. 

PRINCE HENRY'S HIGH SCHOOL

This was a £1.8m project to replace the existing MFL block. We assisted the school with securing funding and provided a turn-key package from the bid stage. The accommodation includes the MFL classrooms on all three floors. 

PRINCE HENRY'S HIGH SCHOOL

This was a £1.4m project to refurbish the science department. We assisted the school with securing funding and provided a turn-key package from the bid stage. The existing building is Victorian, but the classrooms are state of art. 

HANLEY CASTLE HIGH SCHOOL

This was a £1.3m project to provide a new 6th Form Block. We assisted the school with securing funding and provided a turn-key package from the bid stage. The accommodation includes classrooms, IT hub, 6th form common room, quiet study rooms and toilets. 

HAGLEY PRIMARY SCHOOL

This was a £750k project to create an additional two classrooms with cloak space as well as staffroom remodelling and new central hub at the heart of the school.

HANLEY CASTLE HIGH SCHOOL

This was a £450k project to re-roof the 400 year old clay tiled roofs to the Grade II Listed parts of the school. 

THE CHANTRY SCHOOL

This £2.2m expansion project created an additional 10 classrooms along with internal remodelling to form 3 science labs, enlarged dining facilities, staff room and main school reception.

KEMPSEY PRIMARY SCHOOL

This £500K expansion project created a new three classroom block with toilets and breakout spaces, the solar panels will generate an income for the school.

Webheath Primary School
 

This was a £1.8m school expansion project. The accommodation consists of classrooms, toilets, staffroom, hall extension and studio with extensive external remodelling. We assisted the school with securing funding and provided a turn-key package from the bid stage.

The Coppice Primary School
 

This was a £1.6m project to provide a new school block with hall. We assisted the school with securing funding and provided a turn-key package from the bid stage. The accommodation includes 6 classrooms, school hall and church. 

Droitwich Spa High School
 

This was a £350k project to refurbish three science laboratories and replace windows. We assisted the school with securing funding and provided a turn-key package from the bid stage.

Christopher Whitehead Language College
 

This was a £3m project. The three storey accommodation consists of 21 classrooms, toilets and staff accommodation.

IMG_3114.JPG
Newbridge School, Worcester
 

This was a £240k project. The whole school had a new roof, anti-climb gutter and rainwater pipes.

P1070397.JPG
Hanbury School
 

This was a £200k project. The front reception to the school was extended and modified and a classroom at the rear of the school was extended.

P1070401.JPG